众所周知,彩钢板的承载能力好,外形美观,板块利用系数大,连接方式方便,符合国内模式的波距和波形。那么您知道彩钢板墙体施工的6种方法具体是什么吗?下面
济南彩钢制作厂家为您讲解吧。
As we all know, the color steel plate has good bearing capacity, beautiful appearance, large plate utilization coefficient, convenient connection mode, and conforms to the wave distance and waveform of the domestic model. So do you know what are the six methods of color steel plate wall construction? Now, Jinan Color Steel Manufacturer will explain it to you.
一、彩钢板墙体的垂直布局
1、 Vertical layout of color steel plate wall
当布置垂直墙板时,应使用飘带窗。这个隔断可以减少洞口的结构,有助于防雨。使用单面窗时,窗户两侧结构复杂,施工时不易漏雨。排板时选择布局起始线,排板与开口大小相协调。墙板横向排列时,主要解决窗户两侧结构复杂,施工时不易漏雨的问题。排列印版时,选择开放线。
When arranging vertical wallboards, ribbon windows shall be used. This partition can reduce the structure of the opening and help prevent rain. When single window is used, the structure on both sides of the window is complex, and it is not easy to leak rain during construction. Select the starting line of layout when arranging plates, and the plate arrangement shall be consistent with the opening size. When the wallboards are arranged horizontally, the problem that the structure on both sides of the window is complex and it is not easy to leak rain during construction is mainly solved. When arranging plates, select open lines.
二、彩钢板设置要横向墙体
2、 Color steel plate shall be set with horizontal wall
侧墙板主要用于夹芯板,有时也用于单层异型板。这种方法将板宽作为模块的垂直布局。设计大于板宽的孔洞时,尽量将孔洞的上下边缘与板的横缝结合,以免造成结构复杂。横向墙板多与柱中轴线分开,首尾柱之间的板长为柱距尺寸,加上首尾柱的轴向长度为柱距尺寸,中间墙板的长度为柱距尺寸,柱轴线的长度为柱距尺寸。根据不同的斜坡,斜坡上石板的长度。
Side wall panels are mainly used for sandwich panels, and sometimes also for single-layer profiled panels. This method takes the board width as the vertical layout of the module. When designing holes larger than the width of the plate, try to combine the upper and lower edges of the holes with the transverse joints of the plate to avoid complex structures. The horizontal wall panel is mostly separated from the column axis. The length of the panel between the head and tail columns is the column spacing dimension, plus the axial length of the head and tail columns is the column spacing dimension, the length of the middle wall panel is the column spacing dimension, and the length of the column axis is the column spacing dimension. According to different slopes, the length of the slab on the slope.
三、彩钢板墙体无绝缘板连接
3、 Color steel plate wall without insulation board connection
非绝缘板连接有两种:明接和暗接。接合时,将接合的扣件连接到接头上,接头与墙梁连接。这种连接使得紧固件的头部在墙壁的凹入部分更美观。当某些波距较大时,连接扣件也可设置在波峰处。隐蔽板的覆盖范围很窄。一板与墙体连接后,二板插入一板的边槽,抵抗负风压。
There are two types of non insulated board connection: exposed connection and concealed connection. When jointing, connect the jointed fastener to the joint, and the joint is connected with the wall beam. This connection makes the recessed part of the fastener head in the wall more beautiful. When some wave distances are large, the connecting fasteners can also be set at the wave crest. Covering area of concealed board is very narrow. After the first plate is connected with the wall, the second plate is inserted into the side groove of the first plate to resist negative wind pressure.
四、夹板连接
4、 Splint connection
夹芯板的连接方式有工字钢连接、承插连接和暗扣连接。
The connection methods of sandwich panels include I-beam connection, socket connection and concealed connection.
五、彩钢墙基础结构
5、 Color steel wall foundation structure
墙体结构主要解决防止雨水渗入室内的问题。为防止墙体留下的雨水渗入室内,接缝处的地面和矮墙顶部用混凝土浇筑成60mm高的彩钢板混凝土框架。
The wall structure mainly solves the problem of preventing rainwater from seeping into the room. In order to prevent rainwater left by the wall from seeping into the room, the ground at the joint and the top of the low wall shall be concreted into a 60mm high color steel plate concrete frame.
六、门窗安装
6、 Door and window installation
门窗的轮廓尺寸和洞口尺寸要紧密结合。一般门窗比洞口小5mm左右,安装误差太大。一般安装在钢墙梁上,也有安装在墙板上的门窗。此时,根据门窗的轮廓尺寸在墙板上打孔。安装好门窗框后,用密封胶密封门窗。在门框外安装门窗时,应先在门窗周围安装包装带,并压紧包装带。
The outline dimensions of doors and windows shall be closely combined with the opening dimensions. Generally, the doors and windows are about 5mm smaller than the opening, and the installation error is too large. Generally, it is installed on the steel wall beam, and there are also doors and windows installed on the wallboard. At this time, punch holes on the wallboard according to the outline dimensions of the doors and windows. After installing the door and window frames, seal the doors and windows with sealant. When installing doors and windows outside the door frame, first install packaging tape around the doors and windows, and press the packaging tape tightly.
此外要知道,在出厂时厂家赠与出厂合格证和产品质量证明书,在证书上注明产品标准号、钢板号、镀锌数量、表面结构、表面质量、规格、尺寸、形状精度等详细参数。针对这种材料,您还有什么不明白的地方可以随时来我们网站
http://www.lxcaigang.com进行咨询!
In addition, the manufacturer shall present the factory certificate and product quality certificate when leaving the factory, and indicate the product standard number, steel plate number, quantity of galvanizing, surface structure, surface quality, specification, size, shape accuracy and other detailed parameters on the certificate. For this material, you can come to our website at any time if you don't understand anything http://www.lxcaigang.com Consult!