济南工程板房的基础与任何建筑一样,基础决定上层建筑,符合标准的基础能够保证板房使用期间的性和舒适度。因此,临建板房的基础一定要符合板房的标准。
The foundation of the engineering plank house is the same as any building. The foundation determines the superstructure. The standard foundation can ensure the safety and comfort of the plank house during its use. Therefore, the foundation of temporary plank house must conform to the standard of plank house.
板房(T型板房)要求条型基础400*400mm,且同时须要做好地坪,地坪和基础一样水平,即为平板基础;而标准板房(K型板房)只要先做好条型基础300*300mm就可以安装板房了
The plank house (T-shaped plank house) requires a strip foundation of 400 * 400mm, and at the same time, the floor must be well prepared. The floor is the same level as the foundation, that is, the slab foundation; The standard plank house (K-type plank house) can be installed as long as the strip foundation of 300 * 300mm is completed first
根据场地条件和条型基础图纸,钉好基础模板,再用普通混凝土浇灌,并保持基础面水平,如果场地为回填土,则需夯实和铺垫层,并视场地情况可放几根钢筋,以保证基础整体在板房使用期间不会下沉。
According to the site conditions and strip foundation drawings, the foundation formwork shall be nailed first, then ordinary concrete shall be used for pouring, and the foundation surface shall be kept horizontal. If the site is backfilled, it shall be tamped and paved, and several reinforcements can be placed according to the site conditions to ensure that the foundation will not sink during the use of the plank house as a whole.
安装K房后,再做室内地坪,这样可凭隔墙板底端和地梁确定地坪的厚度,只要地坪比地梁高,雨水就不会渗进板房室内,如果安装K房提供平板基础就有可能雨水倒流,导致室内漏水。
After the installation of room K, the indoor floor shall be made, so that the thickness of the floor can be determined by the bottom of the partition board and the floor beam. As long as the floor is higher than the floor beam, the rainwater will not penetrate into the room. If the installation of room K provides a flat foundation, the rainwater may flow back, causing indoor water leakage.
注意,安装板房须要做条型基础400*400mm,并且同时要做好地坪;若不同时做好地坪,会影响板房的安装质量,所以板房的安装基础要求,须是基础和地坪同时做好。
Note that the strip foundation 400 * 400mm shall be made for the installation of plank house, and the floor shall be prepared at the same time; If the floor is not prepared at the same time, the installation quality of the plank house will be affected. Therefore, the installation foundation of the plank house must be prepared at the same time with the floor.
What is the standard for the foundation of engineering plank house? The above contents can be used as reference, and more related matters can be found on our website http://www.lxcaigang.com Consult!