我们在安装工程板房的前,应该先去了解安装过程中应格外注意的事项,避免施工中出现故障。为了保证工程板房的施工质量,我们选择的工作人员进行操作。今天小编在这里主要为大家讲解安装工程板房应该注意的事项。
Before we install the engineering panel room, we should first understand the safety matters that should be paid special attention to in the installation process, so as to avoid the failure in the construction. In order to ensure the construction quality of the project board room, we choose professional staff to operate. Today, the small editor is here to explain the installation project board room should pay attention to the matters.
1、工程板房安装位置的选择。安装位置一定要合理的选择,需要选择地面平整的区域,将板房运输到目的地,进行相关部件的安装,安装后,再固定在地面上。
1. Selection of installation position of Engineering panel room. The installation position must be selected reasonably, and the area with flat ground should be selected. Firstly, the panel room should be transported to the destination for the installation of relevant parts, and then fixed on the ground after installation.
2、其次,在安装前,我们还需要检查购买的工程板房质量,板房连接部分的密封性能如何,是否符合防潮、防水、防火等优良的特性。
2. Secondly, before installation, we also need to check the quality of the purchased engineering panel room, the sealing performance of the connection part of the board room, and whether it conforms to the excellent characteristics of moisture-proof, waterproof and fireproof.
3、工程板房的外墙安装要按照装配图安装。在安装之前,应该将外墙板进行擦洗,确保表面质量好,外墙板接缝,应顺水流方向拼接。
3. The external wall installation of Engineering panel room shall be in accordance with the assembly drawing. Before installation, the exterior wall panel should be scrubbed to ensure good surface quality. The joints of exterior wall panel should be spliced along the water flow direction.
4、先对地梁、立柱进行安装,安装顺序柱—圈梁—调节拉杆,走道托架可以随着柱一起安装,在地面将走道托架与柱连接,为一体,立柱安装后,应立即安装圈梁和调节拉杆。
4. The ground beam and column shall be installed first, and the installation sequence is column ring beam adjusting rod. The corridor bracket can be installed along with the column. The corridor bracket and column are connected as a whole on the ground. After the column is installed, the ring beam and adjusting rod shall be installed immediately.
5、安装窗户,窗户安装时候,要保证窗框线与窗洞口上所画线重合。
5. When installing the window, ensure that the center line of the window frame coincides with the center line drawn on the window opening.
6、安装工程板房的门。门外框、门把头、门头板、门扇、锁具插销、打胶等步骤。
6. Install the door of Engineering panel room. Door frame, door handle head, door headboard, door leaf, lock bolt, gluing and other steps.
以上的内容就是小编为大家讲解的安装工程板房应该注意的内容,喜欢我们产品的朋友可以来电进行咨询,期待您的来电。
The above content is the content of installation engineering board room should pay attention to, like our products friends can call for consultation, looking forward to your call.