活动板房与建楼房差不多,将四周及隔墙基础找平,更好用钢筋混凝土,比较结实;然后立柱子,用横向梁将骨架连起来,上隔板、外墙板与门窗框;跟着铺地板,再向上安上一层,然后上屋架和屋面板;安装门窗等,拉竖向支撑。还有就是卫生洁具啊、小五金之类的。
The movable board house is similar to a building. The foundation of the surrounding and partition walls should be leveled with reinforced concrete, which is more solid. Then the columns are erected, and the framework is connected by transverse beams. The partition board, external wall panel and door and window frames are erected. Then the floor is paved, and then a layer is installed, and then the roof truss and roof panel are installed. Finally, doors and windows are installed and vertical support is pulled. There are sanitary ware, hardware and so on.
其实这种就是轻钢结构,与重钢结构厂房很类似。
In fact, this is the light steel structure, which is very similar to the heavy steel structure workshop.
活动房隐蔽工程是指在施工过程中,完成上一道工序后,将被下一道工序所掩盖,全部完工后无法进行检查的部位,做居室装修,“隐蔽工程”是关键,如果“隐蔽工程”没有做好,表面装饰得再漂亮,也是徒劳。
The concealed project of movable house refers to the parts that will be covered by the next process after the completion of the previous process and can not be inspected after the completion of the whole construction. The "hidden project" is the key to the decoration of the living room. If the "hidden project" is not well done, the surface decoration will be more beautiful, which is also futile.
“隐蔽工程”可分为水安装、电安装及防潮、防水等项目。其中的每一个项目都不容忽视,如果哪一个环节出了问题,都可能带来严重的经济损失,甚对人身带来伤害。防水工程的施工工艺和材料识别,避免不必要的经济损失和伤害。
"Concealed works" can be divided into water installation, electrical installation and moisture-proof, waterproof and other projects. Every project can not be ignored. If any link goes wrong, it may bring serious economic losses, even harm to personal safety. Waterproof engineering construction technology and material identification, to avoid unnecessary economic loss and injury.