济南工程板房搭建有哪些施工要求?

来源:http://www.lxcaigang.com 日期:2020-08-03 发布人:
活动板房安装必须具有在技术监督备案才能进行施工,并且活动板房的生产企业,应提供完整的建筑结构安装图纸、产品出厂合格证、材质证明及检测报告、使用说明书、相关验收标准等。那么济南工程板房搭建有哪些施工要求? 
The installation of prefabricated house must be put on the record of technical supervision before construction, and the manufacturer of prefabricated house shall provide complete building structure installation drawings, product ex factory certificate, material certificate and test report, operation instruction and relevant acceptance standards. What are the construction requirements for the construction of slab house in Jinan?
济南工程板房搭建施工要求
Construction requirements of slab house construction in Jinan project
(1)活动板房安装,应由具有相应资质的施工企业、或生产厂家承担。安装单位应根据合同文件、安装图纸以及相关标准编制安装施工方案,并按方案组织实施。
(1) The installation of prefabricated houses shall be undertaken by construction enterprises or manufacturers with corresponding qualifications. The installation unit shall prepare the installation construction scheme according to the contract documents, installation drawings and relevant standards, and organize the implementation according to the scheme.
(2)活动板房层数更多不应超过2层,每层建筑面积不应超过300㎡,并且大于200㎡时,其疏散楼梯的数量不应少于2部。
(2) The number of floors of prefabricated house shall not exceed 2, and the building area of each floor shall not exceed 300 m2. When the floor area is more than 200 m2, the number of evacuation stairs shall not be less than 2.
房间门楼梯的距离不应大于25m,楼梯的净宽不应小于1.1m。宿舍房间的建筑面积不应大于30㎡,房间门应朝疏散方向开启。
The maximum distance between the room door and the stairs should not be greater than 25m, and the clear width of the stairs should not be less than 1.1m. The building area of the dormitory room should not be greater than 30 m2, and the room door should be opened towards the evacuation direction.
(3)活动板房安装完成后,应由安装单位进行自检,经自检合格后应由施工总承包单位组织监理单位、使用单位、安装单位进行联合验收,合格后方可交付使用。
(3) After the installation of prefabricated house is completed, the installation unit shall carry out self inspection. After passing the self inspection, the general contractor shall organize the supervision unit, the user and the installation unit to carry out joint acceptance, and the house can be delivered for use only after it is qualified.
以上就是济南工程板房搭建有哪些施工的全部内容了,如果你还有关于济南工程板房的问题,请咨询在线客服,或者直接致电咨询!
The above is the whole content of Jinan project board room construction, if you have any questions about Jinan project board room, please consult online customer service, or call directly for consultation!