济南活动板房与建楼房差不多,将四周及隔墙基础找平,尽量用钢筋混凝土,比较结实;然后立柱子,用横向梁将骨架连起来,上隔板、外墙板与门窗框;跟着铺地板,再向上安上一层,然后上屋架和屋面板;然后安装门窗等,拉竖向支撑。还有就是卫生洁具啊、小五金之类的。
Jinan mobile board house is similar to a building. The surrounding and partition wall foundation should be leveled, and reinforced concrete should be used as much as possible to make it more solid; then, columns should be erected, and the framework should be connected with transverse beams, and the partition board, outer wall panel and door and window frames should be installed; then, the floor should be paved, and then the roof truss and roof panel should be installed; then, doors and windows should be installed and vertical support should be pulled. There are sanitary ware, hardware and so on.
其实这种就是轻钢结构,与重钢结构厂房很类似。济南活动板房隐蔽工程是指在施工过程中,完成上一道工序后,将被下一道工序所掩盖,全部完工后无法进行检查的部位,做居室装修,“隐蔽工程”是关键,如果“隐蔽工程”没有做好,表面装饰得再漂亮,也是徒劳。
In fact, this is the light steel structure, which is very similar to the heavy steel structure workshop. The concealed project of Jinan mobile plank house refers to the parts that will be covered by the next process after the completion of the previous process, and can not be inspected after the completion of all the parts. The "hidden project" is the key. If the "hidden project" is not done well, the surface decoration will be more beautiful, which is also futile.
“隐蔽工程”可分为水安装、电安装及防潮、防水等项目。其中的每一个项目都不容忽视,如果哪一个环节出了问题,都可能带来严重的经济损失,甚对人身带来伤害。防水工程的施工工艺和材料识别,避免不必要的经济损失和伤害。
"Concealed works" can be divided into water installation, electrical installation and moisture-proof, waterproof and other projects. Every project can not be ignored. If any link goes wrong, it may bring serious economic losses, even harm to personal safety. Waterproof engineering construction technology and material identification, to avoid unnecessary economic loss and injury.
一:按照活动板房基础施工图,把建设基础,晾晒少3天,之后开始才可以建设板房墙体。紧靠平面图中双线的内边铺设地梁,用爆炸螺栓连接,在地梁的各个连接角及个中树立柱子,注意:板房山墙两边树立双斜口柱。
1: According to the construction drawing of the movable plank house foundation, the construction foundation should be dried for at least 3 days, and then the board house wall can be constructed. Lay the ground beam close to the inner edge of the double line in the plan, connect it with explosive bolts, and set up columns in each connection angle and one of the ground beams. Note: double inclined column shall be set up on both sides of gable wall of slab house.
二:根据施工图的各个视图在地上拼装好墙体,在底端用5.2的铆钉铆接上铝材地扣槽,记住按施工图的位置截出门窗的位置,并且铆接上铝材框,注意:板与板之间先不铆接,只是先平铺组装,以定好门窗位置及铆好门窗铝材框。
2: According to each view of the construction drawing, the wall is assembled on the ground, and the aluminum floor buckle groove is riveted with 5.2 rivets at the bottom. Remember to cut out the position of the door and window according to the position of the construction drawing, and rivet the aluminum frame. Note: there is no riveting between the plate and the plate, but first lay and assemble, so as to fix the position of the door and window and rivet the aluminum frame of the door and window.
三:根据济南活动板房设计平面图,把已经拼装过的各个位置的板一张一张的逐一立起来,板与板之间用铆钉铆接,外转角用圆弧铝铆接,内转角用角铝铆接。
3: According to the design plan of Jinan mobile house, the boards at each position that have been assembled are erected one by one. Rivets are used to rivet between plates, arc aluminum rivets are used for outer corners, and angular aluminum rivets are used for inner corners.
四:按照活动板房施工图中的大波瓦分布图逐一往如上图完成的实体上盖上大波瓦,用75的自攻钉链接。
4: According to the distribution diagram of large wave tiles in the construction drawing of movable board house, cover the completed entity as shown in the above figure one by one, and use 75 self tapping screws to link.
五:在活动板房屋脊上铆接上屋脊瓦,山墙接上山墙收口,前后檐接上水槽,均用铆钉铆接。(平顶型的没有屋脊和屋脊瓦。)然后在板房的屋顶的每条缝隙上和每个铆钉上打上玻璃胶,外墙缝隙及窗四周都打上玻璃胶。
5: The roof ridge tile is riveted on the roof ridge of the movable board house, the gable is connected with the gable closure, and the front and rear eaves are connected with the flume. (the flat top type has no ridge and roof tiles. )Then, glass glue is applied to every gap and rivet on the roof of the board house, and glass glue is applied to the cracks of the outer wall and around the windows.
以上就是今天为大家分析的关于
济南活动板房安装顺序及方法的全部内容,希望对大家能有所帮助,如果想要了解更多内容可以电话联系我们或者在我们的网站进行留言,我们的工作人员会及时与大家取得联系。
The above is the analysis of today's Jinan mobile plank house installation sequence and method of the whole content, I hope to help you, if you want to know more, you can contact us by phone or leave a message on our website, our staff will contact you in time.