活动板房是目前被广泛应用的一种新型建筑,在一些行业中被使用的极为的频繁,如建筑行业。基本上所有的施工人员都是住在活动板房中,十分的方便,另外就是在一些受灾区。如目前的日本,盈江地区。被应用的十分的多。另外就是一些用作仓库,或者其他用途的临时住房。可以说活动板房应用的一个跨度很大。
Prefabricated house is a new type of environmental protection building which is widely used in some industries, such as the construction industry. Basically, all the construction workers live in prefabricated houses, which is very convenient. In addition, in some disaster areas. Such as the current Japan, Yingjiang area. It's used a lot. There are also some temporary houses for storage or other purposes. It can be said that the application of prefabricated house has a large span.
济南活动板房厂发现因为活动板房的这些作用,应用范围的广,跨度大。所以需求量也高。导致目前的活动板房的发展也十分的迅速,活动板房的各项功能和各项指标也越来越高。当然人们对于这样的一个住宅的要求也在越来越高。
Jinan movable board house factory found that because of these functions of movable board house, the application scope is wide and the span is large. So the demand is high. As a result, the development of the current prefabricated house is also very rapid, and the functions and indicators of the prefabricated house are getting higher and higher. Of course, people's demand for such a residence is also higher and higher.、
毕竟发展和需求是同步,产品的发展是根据市场的需求而决定的,活动板房也不例外。
After all, development and demand are synchronous. The development of products is determined by the market demand, and the prefabricated house is no exception.
作为一个新时代的产物,是势必活动板房的一些功能及应用于传统的建筑有着很大的不同,如在安装的方式上,而这也是更为显示不同的一个特色。活动板房的安装程序是这样的:
As a product of a new era, it is inevitable that some functions and applications of prefabricated houses in traditional buildings are very different, such as in the way of installation, which is also the most different feature. The installation procedure of prefabricated house is as follows:
将四周及隔墙基础沼平,用钢筋混凝土,比较结实;立柱子,用横向梁将骨架连起来,上隔板、外墙板与门窗框;跟着铺地板,再向上安上一层,然后上屋架和屋面板;安装门窗等,拉竖向支撑。
The foundation of the surrounding and partition walls shall be flat, and reinforced concrete shall be used to make it more solid; the column shall be erected, and the framework shall be connected with transverse beams, and the partition board, outer wall panel and door and window frame shall be installed; the floor shall be paved, and then the upper layer shall be installed, and then the roof truss and roof panel shall be installed; finally, the doors and windows shall be installed, and the vertical support shall be pulled.
还有就是卫生洁具啊、小五金之类的。当然在这些完成的时候,要做好一些隐蔽性的工程,这样我们所使用的活动板房也会比较方便及实用。
There are sanitary ware, hardware and so on. Of course, when these are completed, we should do some hidden works well, so that the movable houses we use will be more convenient and practical.