工程板房想要保证质量过关,就要做好验收环节。不然在使用过程中就会出现各种各样的问题,导致居住质量下降,那么工程板房应该如何验收呢?下面
济南工程板房厂家就给大家介绍介绍:
In order to ensure the quality of the prefabricated house, it is necessary to do a good job in the acceptance process. Otherwise, there will be various problems in the use process, resulting in the decline of living quality, so how should the engineering plank house be accepted? Next, the manufacturers of prefabricated houses in Jinan will introduce to you:
1、先看工程板房的外观,颜色应该整体协调。工程板房的制造商在出厂前应仔细检查工程板房的安装部件是否合格,焊接是否牢固。
1. First of all, look at the appearance of the engineering prefabricated house. The color should be coordinated as a whole. The manufacturer of the engineering prefabricated house shall carefully check whether the installation parts of the engineering prefabricated house are qualified and whether the welding is firm before leaving the factory.
2、工程板房安装完毕后,务必检查其防火性能,检查房屋内的电线是否隐藏在防火管道中。检查彩钢夹芯板的内外层是否破损,不要暴露出中间的保温隔热层。
2. After the installation of the engineering plank house, be sure to check its fire performance and check whether the wires in the house are hidden in the fire pipes. Check whether the inner and outer layers of the color steel sandwich panel are damaged, and do not expose the middle thermal insulation layer.
3、检查工程板房的门窗滑动是否灵活,锁是否牢固。连接件和紧固件应牢固结合,工程板房的框架不松动。
3. Check whether the doors and windows of the engineering plank house slide flexibly and whether the lock is firm. The connectors and fasteners shall be firmly combined, and the frame of the engineering plank house shall not be loose.
4、工程板房的涂漆部分应具有相同的色调,外墙板的保护层不应出现褪色或脱落的现象。走廊和楼梯栏杆应光滑无毛刺。工程板房的地板也应固定牢固。
4. The painted part of the engineering plank house shall have the same color, and the protective layer of the outer wall panel shall not fade or fall off. Corridors and stair railings shall be smooth and free of burrs. The floor of the engineering plank house shall also be fixed firmly.
5、看墙板、门、窗和工程板房的结构部分是否有光进入,组装后应该没有可见的光。如果出现光泄漏,则意味着工程板房的隔热性能不是很好。如果有间隙的话,还会漏风。
5. Check whether there is light entering the wall panels, doors, windows and the structural parts of the engineering plank house. There should be no visible light after assembly. If there is light leakage, it means that the thermal insulation performance of the engineering plank house is not very good. If there is a gap, there will be air leakage.
6、屋顶,门窗,工程板房的墙壁,地面无漏水。顶板和支撑构件具有可靠的连接,否则如果遇到诸如强风的恶劣天气,工程板房的屋顶就会很容易遭到损坏。
6. There is no water leakage on the roof, doors and windows, the walls of the engineering plank house, and the ground. The roof and supporting members have reliable connection, otherwise the roof of the engineering plank house will be easily damaged in case of severe weather such as strong wind.
This is the work that must be done to ensure the quality of the prefabricated house. If you have any questions about this, please contact us to deal with it http://www.lxcaigang.com Solve it!