1)活动的原部件进行改造房间的加固设计,施工和承诺,力争达到单位,施工单位根据确定的经验和更合理的设计实施的活动板房水平。
1) The original parts of the activity to transform the room reinforcement design, construction and commitment, and strive to achieve the unit, the construction unit according to the determined experience and more reasonable design and implementation of the activity board room level.
2)钢筋混凝土结构房屋使用年限,由业主和设计单位,一般为30年指定的同意。当地的生活结构和结构加固已使用和不超过50年的年数,作为业主项目要求或特殊需要的结果,有一个较长的寿命,应采取的措施旨在活动板房加强如果有必要,们将召开会议,讨论确定解决方案。原有的抗震设计,低强度的或旧的混凝土房屋结构的抗震设防标准设计,加固活动板房改造现有规范的大部分是难以达到设计要求。
2) The service life of the reinforced concrete structure house is generally 30 years as agreed by the owner and the design unit. The local living structure and structural reinforcement have been used for no more than 50 years. As a result of the owner's project requirements or special needs, it has a long life. The measures to be taken are aimed at strengthening the prefabricated house. If necessary, experts will hold a meeting to discuss and determine the solution. The original seismic design, low-strength or old concrete building structure seismic fortification standard design, strengthening activity plank house transformation, most of the existing specifications are difficult to meet the design requirements.
3)活动房加固由有资格的设计单位或科研单位进行加固改造活动板房设计应。
3) The reinforcement of the movable house shall be carried out by the qualified design unit or scientific research unit, and the design of the movable board house shall be carried out.
4)鉴定和检测修改钢筋的施工图设计文件,但也需要与新的建筑施工图文件,发送文件审查施工图审查部门,如果在一楼门面或大型临时改造的主要街道上的原始屋顶,活动板房设计中应由当地规划部门批准的设计文件,应与新的工程设计存档。xH5浙江大厦网络7相同。
4) Identify and test the construction drawing design documents of the modified reinforcement, but also need to be sent with the new construction drawing documents to the construction drawing review department for document review. If the original roof is on the first floor facade or the main street of the large-scale temporary reconstruction, the design documents that should be approved by the local planning department in the design of the prefabricated house should be filed with the new engineering design. Xh5 Zhejiang building network 7 is the same.
改造设计中使用的加固材料应轻,以利于减少地震反应,以避免原有的基础上进行加固;层应提高钢结构屋顶的使用,轻维护结构;原子结构,减少或没有加固,以较低的房屋使用的影响,减少活动板房电力传输加固原来的组成部分,应明确,结构简单,无损伤或损伤较小的现有结构,活动板房施工方便,成本低的方案;需要考虑力滞后造成材料的强度增加的压力,应该是新标准的第二部分,法规做出相应的折扣;应遵循加固施工简单,方便,我们可以保证活动板房质量,这是一个原因。
The reinforcement materials used in the reconstruction design should be light, so as to reduce the seismic response and avoid reinforcement on the original foundation; The use of steel roof should be improved and the structure should be maintained lightly; Atomic structure, reduce or no reinforcement, to lower the impact of housing use, reduce the power transmission reinforcement of the original components of the prefabricated house, should be clear, simple structure, no damage or less damage to the existing structure, the prefabricated house construction is convenient, low cost program; It should be the second part of the new standard to consider the pressure of material strength increase caused by force lag, and the corresponding discount should be made by the regulations; Should follow the reinforcement construction is simple, convenient, we can ensure the quality of prefabricated house, this is a reason.