注意人身:施工单位应为职工提供足够的食品饮料和发放清凉油、风油精等防暑降温的药品。露天和高温作业者应多喝茶水、绿豆汤和含盐浓度0.1-0.3%的清凉饮料,但切记暴饮,每次不超过300毫升。施工现场严禁施工人员赤膊、穿拖鞋和酒后上岗,禁止带病作业,要加强个人防护。
First of all, pay attention to personal safety: the construction unit shall provide sufficient food and drink for the staff and distribute cooling oil, essential balm and other heatstroke prevention drugs. Outdoor and high temperature workers should drink more tea, mung bean soup and cool drinks with 0.1-0.3% salt concentration, but remember to drink too much, no more than 300 ml each time. On the construction site, it is strictly forbidden for the construction personnel to work naked, wear slippers and after drinking. It is forbidden to work with diseases, and personal protection should be strengthened.
其次,工程雨天施工时,彩钢房工程宜搭设临时防护棚,雨水不得飘落在炽热的焊缝上.如焊接部位比较潮湿,必须用干布擦净并在焊接前用氧炔焰烤干,保持接缝干燥,没有残留水分。雨天施行彩钢房工程吊装时,构件上如有积水,安装前应干净,但不得损涂层,高强螺栓接头安装时,构件摩擦面应干净,不能有水珠,更不能雨淋和接触泥土及油污等脏物。
Secondly, when the project is constructed in rainy days, the temporary protective shed should be set up for the color steel room project, and the rain should not fall on the hot welding seam. If the welding part is wet, it must be cleaned with dry cloth and dried with oxyacetylene flame before welding, so as to keep the joints dry without residual moisture. During the hoisting of color steel house in rainy days, if there is water on the component, it shall be cleaned before installation, but the coating shall not be damaged. During the installation of high-strength bolt joint, the friction surface of the component shall be clean, without water drops, rain, soil, oil and other dirt.
还有就是,工程雨天天气构件不能进行涂刷工作。雨天及五级以上大风不能进行屋面保温的施工。雨天由于空气比较潮湿,焊条储存应防潮并进行烘烤,同一焊条重复烘烤次数不宜超过两次,并由管理人员及时做好烤记录。
In addition, the components cannot be painted in rainy days. Roof insulation construction can not be carried out in rainy days and gale above level 5. In rainy days, because the air is humid, the welding rod should be stored moisture-proof and baked. The same welding rod should not be baked more than twice, and the management personnel should make baking records in time.
施工的时候如遇上大风天气,柱、主梁、支撑等大构件应立即进行校正,位置校正正确后立即进行固定,以防止发生单侧失稳.当天安装的构件,应形成空间稳定体系
In case of windy weather during construction, large components such as column, main beam and support shall be corrected immediately. After correct position correction, they shall be fixed immediately to prevent unilateral instability. Components installed on the same day shall form a space stable system